Miller Way Noise Wall (Glenwood)
-
Client
Transport for NSW
-
Lead Contractor
WSP Australia
-
Sector
Road Upgrade
-
Value
N/A
-
Location
Kellyville, NSW
-
Year
2022
This project was carried out within an established suburban corridor, with the existing streetscape vegetation, road infrastructure, and property boundaries affecting how works could be delivered.
Tree Survey was engaged in 2022 to assess vegetation directly adjacent to the proposed noise wall alignment and associated access works. Our services included a Tree Survey and Preliminary Tree Assessment to confirm tree species, condition, and proximity to retaining structures and boundary interfaces, providing a clear understanding of site constraints.
The findings informed an Arboricultural Impact Assessment, which identified trees requiring protection, pruning or removal to facilitate construction. A tailored Tree Protection Plan was then prepared to set out rigorous measures for managing trees throughout the works.
Together, these insights provided practical, precise and site-specific arboricultural guidance to support construction activities. All services were delivered on time and within budget.