Project
Miller Way Noise Wall
-
Client
Transport for NSW
-
Lead Contractor
WSP Australia
-
Sector
Road Upgrade
-
Value
N/A
-
Location
Glenwood, NSW
-
Year
2023
We started with a Tree Survey, capturing spatial coordinates and detailed tree data within the proposed work area. This information established a reliable baseline for design and approval documentation.
A Preliminary Tree Assessment was then undertaken to record tree health, structure and management considerations. An Arboricultural Impact Assessment followed, identifying where excavation, footing installation and access requirements could affect existing trees and outlining clear management responses.
Finally, a site-specific Tree Protection Plan was prepared, incorporating accurate mapping and practical protection measures to guide contractors during construction.
The outcome was a precise arboricultural record for the Miller Way corridor, delivered within budget and on schedule. These insights supported compliance requirements, informed construction staging, and provided project teams with clear direction throughout installation.